Big foot Systems were tasked with designing and supplying a non-penetrative plant deck solution to provide suitable support for four large chillers and appropriate access throughout to allow easy maintenance to all sides of the units.
The system incorporated mounting points designed to take the nearly two tonne point loads of which the positioning of these were critical to allow a smooth install of the chillers. The steel grid was fabricated to precise dimensions to sit around the chillers tightly leaving no gaps for trip hazards.
We also had to factor in a fall across the slab, so varying height adjustable legs were essential to enable the site team to level up the deck precisely ahead of the chillers being lifted into place.
All parties are very happy with the outcome with all design requirements achieved and delivered in line with programme.
Got a project in mind? Need a quote?
We're here to help with any project requirements.
Precision was key, as the entire deck had to completed prior to the chiller install, all four chillers were crane-lifted and dropped onto our system without issue.
Ashley Simmans
Big Foot Systems Site Engineer
Recent Case Studies
Service Support
APEX Tribecca
Plant Deck
Allen House
Plant Deck
Westfield Shopping Centre
Screen Support
Premier Inn
Got a project in mind? Need a quote?
We're here to help with any project requirements.
Elevate your rooftop knowledge
Be the first to hear our news, technical insights, latest industry innovations as well as a deep dive into our most recent project successes.